|

Left:
View from the river before the renovation began.
Right:
Note new enlarged picture windows, cream paint and red shutters - another big improvement is the rermoval of the trees that obscured the river view.
|
|

|
|

Left:
The former dining room in the basement at the outset.
Right:
New partitions divide the pottery room, exercise area and new student lounge. Latter features computer stations and a wide screen TV area, plus new carpet.
|
|

|
|

Left:
The former dining room in the basement at the outset.
Right:
The new exercise area features a selection of workout machines including special equipment for crew training.
|
|

|
|

Left:
Latané bathrooms before the renovation began.
Right:
Latané bathrooms after renovations with new vanities, new mirrors and improved ventilation and lighting.
|
|

|
|

Left:
Latané 1950 style showers before the renovation began.
Right:
The bathrooms got new shower controls, higher shower heads, and upgraded exhaust ventilation.
|
|

|
|

Left:
Outdated heating and cooling systems before work began.
Right:
The mechanical room has a new boiler, chiller, controls and piping. The entire building now is supplied with a constant flow of treated outside air.
|
|

|
View more of Latane Hall - Front and First Floor
|

|
PAGE 1..........Campus Vision
PAGE 2..........Better Dorms
PAGE 3..........The Campaign
PAGE 4..........Latané Renovations
|

|